Concrete Pump Distance Design Daily Checklist

Product Related Information

  • Job Hazard Analysis Template | JHA | ASCC

    The ASCC Safety & Risk Management Council is dedicated to making jobsite safer for specialty and general contractors. ASCC members gain access to Job Hazard Analysis forms to assist in on-the-job step-by-step hazard identification and elimination. See the full list of templates online.

    GET A QUOTE
  • Report No. K-TRAN: KSUKefid Best Practices for Concrete

    Pumping is one of the major placement techniques used in the concrete industry to deliver concrete from the mixing truck to the formwork. Although concrete pumping has been used to place concrete since the 1960s, there is still a lack of exact knowledge supported by research evidence as to what affects concrete

    GET A QUOTE
  • Concrete Safety Manager Inspections Checklist

    (PDF) Guide to Placing Concrete by Pumping Methods Guide to Placin…

    GET A QUOTE
  • GUIDE TO LIFTING BEAMS AND LIFTING SPREADERS

    Jan 01, 1993 · Tel: 0845 270 2919 - INT: 00 44 161 223 1990 - Email: [email protected] - Web: .dlhonline.co.uk 1 Overview This easy-to-read and comprehensive guide to lifting beams and

    GET A QUOTE
  • Safe Use of Concrete Pumps - Technic Concrete Pumping

    operation of all types of concrete pumps, in addition to any other guidance and legislation that might be appropriate. The Good Practice Guide gives recommendations for the safe use of truck-mounted concrete pumps; some sections will apply to the use of static concrete pumps, trailer-mounted concrete pumps and tower-mounted booms.

    GET A QUOTE
  • Concrete Pump Checklist: Daily Concrete Pump Activity

    (PDF) Guide to Placing Concrete by Pumping Methods Guide to Placin…

    GET A QUOTE
  • TECHNICIAN'S CHECKLIST SECTION 700 CONCRETE …

    • orrect distance from centerline or offset hubs. • orrect width between forms. • Forms on each side at correct elevation. • True to smooth line and grade checked by eyeing in top of form. • Removal prior to 12 hours after concrete placed not permitted. • Damage to edge of …

    GET A QUOTE
  • ACI MANUAL OF CONCRETE INSPECTION

    A1.3—Example 3: Sampling by depth of concrete pavement Appendix 2—Normal distribution curves, p. 20 Appendix 3—Computing standard deviation and required average concrete strength, p. 21 A3.1—Calculating standard deviation s A3.2—Calculating required average strength f cr′ Appendix 4—Control charts on concrete materials, p. 22

    GET A QUOTE
  • Concrete Pumps - DAILY CIVIL

    i) This mechanism can pump concrete through a distance of 1000 m horizontally and 120 m vertically. ii) It can pump as much as 130 cu.m of concrete per hour through an 8-inch pipe. iii) It is very helpful in large projects where large volumes of concrete are to be pumped.

    GET A QUOTE
  • CONSTRUCTION INSPECTOR'S CHECKLIST FOR DRILLED …

    CONSTRUCTION INSPECTOR'S CHECKLIST . FOR . DRILLED SHAFTS . Does the Contractor have an approved concrete mix design? ___ e) Is the concrete mix design nominal maximum aggregate size appropriate for the rebar spacing, and for the clear distance between the rebar and permanent casing or shaft For tremie or concrete pump placement, is

    GET A QUOTE
  • Concrete Pump Hazards & Safety - Concrete Network

    The American Concrete Pumping Association requires that the boom tip and any other section of the boom be at least 17 feet (5 meters) from power lines. Depth perception when judging far away objects is seldom reliable, and should be avoided when operators are placing their booms.

    GET A QUOTE
  • PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

    May 13, 2021 · Remove concrete pump immediately to conduct quick reminder and daily checklist should contact the pump operator on the pump operator to the distance from unauthorized presence in. Introductory page to concrete pump daily checklist is the two trained welders to.

    GET A QUOTE
  • Pump Station Design Guidelines Second Edition

    Pump Station Design Guidelines – Second Edition Jensen Engineered Systems 825 Steneri Way Sparks, NV 89431 For design assistance call (855)468-5600 ©2012 Jensen Precast JensenEngineeredSystems.com

    GET A QUOTE
  • CHECKLIST FOR CONCRETE PUMPING

    CHECKLIST FOR CONCRETE PUMPING Concrete Pump Contractor 2. General Conditions Start Time Pump: am/pm Concrete: am/pm Placement Location Slabs Walls Footings Other Pumping Distance (m) Vertical Horizontal Slump/Air Spec Point of Discharge Point of Placement

    GET A QUOTE
  • Concrete Pump Pre-Mobilisation Checklist

    CONCRETE PUMP. PRE-MOBILISATION CHECKLIST – CHECKLIST. Page 2 of 2. Page 2 of 2. Page 2 of 2. Daily Pre-start book specific to plant type & concrete pump log book (or combined book) Change management documents available for any modifications. Worksafe Plant registration of item and design registration (truck mounted concrete placing boom)

    GET A QUOTE
  • Pump Station Design Guidelines Second Edition

    Pump Station Design Guidelines – Second Edition Jensen Engineered Systems 825 Steneri Way Sparks, NV 89431 For design assistance call (855)468-5600 ©2012 Jensen Precast JensenEngineeredSystems.com

    GET A QUOTE
  • Guidance on Safety in Concrete Pumping

    The detailed design of the concrete pump is subject to the Machinery Directive 2006/42/EC and associated Irish legislation the European Communities (Machinery) Regulations, 2008 [S.I.No.407 of 2008]. In addition, the Irish Standard I.S. EN 12001 deals specifically with concrete pumps and is available from the National Standards

    GET A QUOTE
  • Data Center Checklist - Data Foundry

    At least one feed is underground and concrete-encased end-to-end UPS designed with a maintenance bypass, allowing live full replacement Enter the names of your prospective colocation providers at the top of the checklist. 2. Check off the features found in each facility. 3. When finished touring, compare section scores and total scores for

    GET A QUOTE
  • Concrete Pump Delivery Guidelines

    Concrete Pump Delivery Guidelines To reduce the unacceptable safety risks that may be involved in delivery of concrete to on-site pumps, CCAA has developed a new industry guidelines document and checklist. The clearly organised document explains the risks, controls for equipment operators and steps to plan a safe delivery.

    GET A QUOTE
  • 3 4 Inspection Staff Preparation Advance Preparation

    concrete shall be discharged horizontally a mininum distance of 3 feet. where horizontal discharge is not possible, the use of a double 90-degree bends at the end of the pump hose, reducer hoses, or other equipment capable of maintaining a head of concrete in the pump line may be allowed. 15 concrete placement 16 hose reducer 17 loading on the skew

    GET A QUOTE